1. |
Power factor of Green bayou turbine generator is ______ |
A. | 85 |
B. | 95 |
C. | 60 |
D. | 70 |
Answer» B. 95 | |
2. |
Green Bayou Turbine generator rotates at __________ |
A. | 4000rpm |
B. | 3000 rpm |
C. | 3600 rpm |
D. | 3100 rpm |
Answer» D. 3100 rpm | |
3. |
The outdoor lagging for AIEE-ASME preferred standard turbine is designed for ________ |
A. | 70 P/Sq.ft |
B. | 80 P/Sq.ft |
C. | 90 P/Sq.ft |
D. | 85 P/Sq.ft |
Answer» B. 80 P/Sq.ft | |
4. |
AIEE ASME preferred turbines don t have any side condensers. |
A. | True |
B. | False |
Answer» C. | |