| 1. |
Power factor of Green bayou turbine generator is ______ |
| A. | 85 |
| B. | 95 |
| C. | 60 |
| D. | 70 |
| Answer» B. 95 | |
| 2. |
Green Bayou Turbine generator rotates at __________ |
| A. | 4000rpm |
| B. | 3000 rpm |
| C. | 3600 rpm |
| D. | 3100 rpm |
| Answer» D. 3100 rpm | |
| 3. |
The outdoor lagging for AIEE-ASME preferred standard turbine is designed for ________ |
| A. | 70 P/Sq.ft |
| B. | 80 P/Sq.ft |
| C. | 90 P/Sq.ft |
| D. | 85 P/Sq.ft |
| Answer» B. 80 P/Sq.ft | |
| 4. |
AIEE ASME preferred turbines don t have any side condensers. |
| A. | True |
| B. | False |