| 1. |
While synchronising the DG Set with the utility grid, which of the condition(s) must be satisfied? |
| A. | Voltage of DG Set must be same with the utility grid |
| B. | Phase sequence must be same with the utility grid |
| C. | Frequency must be same with the utility grid |
| D. | All (1), (2) and (3) must be satisfied |
| Answer» E. | |