1.

While selecting the location of an intake for collecting surface water, the factor considered, is

A. The intake point should be near as far as possible to the treatment plant
B. The intake point should be in purer zone of the water source
C. The intake point should be upstream of the point of disposal of waste water
D. All the above
Answer» E.


Discussion

No Comment Found