MCQOPTIONS
Saved Bookmarks
| 1. |
While aligning a highway in a built-up area, it was necessary to provide a horizontal circular curve of radius 375 m. The design speed is 75 kmph. What is the superelevation rate? |
| A. | .0.2000 |
| B. | 0.0667 |
| C. | 0.16 |
| D. | 0.06 |
| E. | 0.075 |
| Answer» C. 0.16 | |