

MCQOPTIONS
Saved Bookmarks
1. |
Which one of the following methods is adopted for permanent drainage of tunnels : |
A. | provision of longitudinal drains |
B. | continuous open drains |
C. | concrete lining |
D. | All the above. |
Answer» E. | |