1.

Which one of the following is the purpose of providing the downstream sheet pile in a barrage?

A. To control failure due to piping by high value of exit gradient
B. To control failure due to scour
C. To stop failure due to sliding
D. To stop failure due to uplift pressure
Answer» B. To control failure due to scour


Discussion

No Comment Found