1. |
Which of these measures the actual capability of the process? |
A. | C<sub>p</sub> |
B. | C<sub>pu</sub> |
C. | C<sub>pk</sub> |
D. | C<sub>pl</sub> |
Answer» D. C<sub>pl</sub> | |