| 1. |
Which of the following systems implementation approaches should be used if you want to run the old system and the new system at the same time for a specified period? |
| A. | direct |
| B. | pilot |
| C. | parallel |
| D. | phased |
| E. | None of the above |
| Answer» D. phased | |