MCQOPTIONS
Saved Bookmarks
| 1. |
Which of the following requires a well intervention (workover)? |
| A. | Determining a well s total production flow rate |
| B. | Shutting off flow from a high water cut interval |
| C. | Measuring a well s percentage of oil, gas and water production |
| D. | The breaking emulsion formed between a well s produced oil and water |
| Answer» C. Measuring a well s percentage of oil, gas and water production | |