MCQOPTIONS
Saved Bookmarks
| 1. |
Which of the following is correct regarding the workover for the low permeable reservoir? |
| A. | The effective artificial technique is required |
| B. | Packer has to be fitted |
| C. | Side pocket mandrel is needed |
| D. | Landing nipple is to be installed |
| Answer» B. Packer has to be fitted | |