1.

Which CD work is generally adopted when the drainage discharge is small and the drain crosses the canal with its bed level equal to or slightly higher than the canal FSL?

A. Syphon Aqueduct
B. Level crossing
C. Inlets and outlets
D. Aqueduct
Answer» D. Aqueduct


Discussion

No Comment Found