MCQOPTIONS
Saved Bookmarks
1. |
Where is the first base depot for unloading of materials situated at? |
A. | End of existing line |
B. | Start of new line |
C. | Junction of existing line and new line to be constructed |
D. | Anywhere based on the topography of the area |
Answer» D. Anywhere based on the topography of the area | |