When the TWC lies below the JHC at all discharges, the problem can be solved by which of the following provisions?i. Constructing a sloping apron above the river bedii. Provision of roller bucket type of energy dissipatoriii. Provision of a ski-jump bucketiv. A sloping apron below the river bedv. Construction of a subsidiary damvi. A sloping apron partly above and partly below the river bed |
A. | i, iii and v |
B. | i, ii and vi |
C. | iii, iv and v |
D. | i, iii, iv and v |
Answer» D. i, iii, iv and v | |