1. |
When the bed level of the canal is higher than the highest flood level (H.F.L.) of the drainage, then the cross drainage work is said to be |
A. | aqueduct |
B. | super-passage |
C. | canal syphon |
D. | syphon aqueduct |
Answer» B. | |