MCQOPTIONS
Saved Bookmarks
| 1. |
When a flexible budget is used then increase in the actual production level within a relevant range would increase |
| A. | variable cost |
| B. | both (a) and (b) |
| C. | total cost |
| D. | fixed cost |
| Answer» C. total cost | |