MCQOPTIONS
Saved Bookmarks
| 1. |
What is the volume of kill fluid pumped into the well for a normal bullheading performed on a producing well? |
| A. | The volume of the tubing +the volume from packer to the target depth |
| B. | The volume of tubing |
| C. | The volume of tubing + the volume below the tubing to the top of perforations |
| D. | The volume of tubing + 50% excess |
| Answer» D. The volume of tubing + 50% excess | |