1.

What is the volume of kill fluid pumped into the well for a normal bullheading performed on a producing well?

A. The volume of the tubing +the volume from packer to the target depth
B. The volume of tubing
C. The volume of tubing + the volume below the tubing to the top of perforations
D. The volume of tubing + 50% excess
Answer» D. The volume of tubing + 50% excess


Discussion

No Comment Found