MCQOPTIONS
Saved Bookmarks
| 1. |
What is done to estimate the cost of the rail line to be constructed in Preliminary survey? |
| A. | Instrumental examination of the route to be selected |
| B. | Study the topography with the help of maps |
| C. | Meeting with local bodies and prominent people |
| D. | Cost is estimated based on different lines of similar alignments |
| Answer» B. Study the topography with the help of maps | |