MCQOPTIONS
Saved Bookmarks
| 1. |
What is done to ensure that at the wheel negotiates the gap of crossing properly? |
| A. | The wheel is widened |
| B. | Speed of train is increased |
| C. | A check rail is provided |
| D. | Material can be filled |
| Answer» D. Material can be filled | |