MCQOPTIONS
Saved Bookmarks
| 1. |
What is done to avoid out-of-sequence mishaps in automatic inspection machine? |
| A. | Clamping between centres and sequence of part lifting are linked on different controls |
| B. | Clamping between centres and gauge fixtures are linked on different controls |
| C. | Sequence of part lifting and gauge fixtures are linked on different controls |
| D. | Sequence of part lifting, clamping between centres and gauge fixtures are linked on same controls |
| Answer» E. | |