What can be the remedial measure adopted for track level variations due to inadequate drainage due to high cess? |
| A. | Improving side drainage by lowering the cess |
| B. | Treatment with lime slurry pressure injection |
| C. | Cement grouting |
| D. | Cationic bituminous emulsion below ballast |
| Answer» B. Treatment with lime slurry pressure injection | |