MCQOPTIONS
Saved Bookmarks
| 1. |
Under multiprogramming, turnaround time for short jobs is usually ________ and that for long jobs is slightly ___________$ |
| A. | Lengthened; Shortened |
| B. | Shortened; Lengthened |
| C. | Shortened; Shortened |
| D. | Shortened; Unchanged |
| Answer» C. Shortened; Shortened | |