MCQOPTIONS
Saved Bookmarks
| 1. |
To indicate proper control of consistency of a freshly mixed concrete for pavement construction, the slump should be between |
| A. | 3 to 5 cm |
| B. | 4 to 6 cm |
| C. | 5 to 7 cm |
| D. | 7 to 10 cm |
| Answer» E. | |