

MCQOPTIONS
Saved Bookmarks
1. |
Three strategies used to handle transition from version 4 to version 6 are dual-stack, tunneling and ________ |
A. | Header Switching |
B. | Header Translation |
C. | Header Transfer |
D. | Header Transmission |
Answer» C. Header Transfer | |