The total blow required for the second and third 15 cm of penetration in standard penetration test is taken as ____________ |
| A. | Seating drive |
| B. | Penetration resistance |
| C. | Overburden pressure |
| D. | Dilatancy/submergence |
| Answer» B. Penetration resistance | |