The temporary casing is known as the __________..
1.
The temporary casing is known as the __________
A.
Support
B.
Formwork
C.
Built up
D.
Casing
Answer» C. Built up
Show Answer
Discussion
No Comment Found
Post Comment
Related MCQs
In formwork for the wall, the _________ are provided by vertical Struts and horizontal wales.
The boxes for beams are play prepared from ________ sides and ________ bottom in formwork for an RCC floor.
The form work for an RCC floor consists of a ___________ to receive the concrete.
The column formwork consists of a box prepared from __________ separate sides.
The ___________ formwork is used for formwork when it is desired to reuse the formwork several times.
The formwork should be sufficiently strong enough to bear the _________ of weight concrete as well as the weights of the equipment, labour, etc.
The __________ of formwork plays a significant role in the cost of concrete.
Forms whose components can be reused several times are known as the _______
The temporary casing is known as the __________