MCQOPTIONS
Saved Bookmarks
| 1. |
The slope and level detector circuit in a CRO has a delay of 100 ns. The start-stop sweep generator has a response time of 50 ns. In order to display correctly, a delay line of |
| A. | 150 ns has to be inserted into the y-channel |
| B. | 150 ns has to be inserted into the x-channel |
| C. | 150 ns has to be inserted into both x and y channel |
| D. | 100 ns has to be inserted into both x and y channel |
| Answer» B. 150 ns has to be inserted into the x-channel | |