The sign used for complete projection is _________...
1.
The sign used for complete projection is __________
A.
+
B.
C.
No sign is used
D.
None of the mentioned
Answer» B.
Show Answer
Discussion
No Comment Found
Post Comment
Related MCQs
The load on a negative conduit is given by the equation __________
The recommended value of settlement ratio for embankment, to use in design is __________
The sign used for complete projection is __________
If the plane of settlement does not fall within the embankment, then such a condition is called _________
Both the projection condition and the ditch conditions of a positive projecting conduit may be __________
If the critical plane settles more than the top of the conduit, the settlement ratio is __________
Critical plane in conduit is located at ___________
The magnitude and direction of relative movements between the interior and exterior prisms of the conduits are dependent upon the ___________
The settlement ratio for a negative projecting conduit is __________
Positive projecting conduits are of ___________ types.