The question below consists of a set of labelled sentences. These sentences, when properly sequenced form a coherent paragraph. Select the most logical order of sentences from among the options.P: About 30 new hydro projects are now under execution with an installed capacity of 5,600 MW.Q: However, with the rapid increase in demand for power, a higher priority was given to the pithead super thermal power stations as their gestation period was smaller than that of the hydel schemes.R: Many projects were taken up for execution after independence and at one time (1962-63), the capacity contribution from hydro schemes was equal to thermal schemes.S: The first hydro generating unit in India was commissioned in Darjeeling (W.Bengal) in 1897.

A. RQPS
B. SRQP
C. QPSR
D. PQRS
Answer» C. QPSR