1.
The quantity of stone ballast required per metre tangent length, is
A.
1.15 m³
B.
1.14 m³
C.
1.13 m³
D.
1.11 m³
Answer» E.
Show Answer
Discussion
No Comment Found
Post Comment
Related MCQs
Coning of wheels is provided
The life of a wooden sleeper depends upon
Pot sleepers are used if degree of the curve does not exceed
A scissors cross over consists of one diamond and
The arrangement of rails which permit trains to cross another track and also to divert to the other track, is called
On a single line track, 10 goods trains loaded with iron ore run from A to B and empty wagons return from B to A daily. Amount of creep of the rails will be
To avoid the damage of nose of crossing, the wing rails are ramped so that nose of crossing remains at a lower level by
Wheels of a rolling stock are provided flanges on
On either side of the centre line of rails, a cant of 1 in 20 in the sleeper is provided for a distance of
On Indian Railways standard length of rails for B.G. track, is
Reply to Comment
×
Name
*
Email
*
Comment
*
Submit Reply