MCQOPTIONS
Saved Bookmarks
| 1. |
The proposed dam shown in the below figure is 90 m long and coefficient of permeability of the soil is 0.0013 mm/second. The quantity of water (m 3 ) that will be lost per day, by seepage is (rounded to the nearest number): |
| A. | 55 |
| B. | 57 |
| C. | 59 |
| D. | 61 |
| Answer» E. | |