The product structure of an assembly P is shown in the figure.Estimated demand for end product P is as followsWeek123456Demand100010001000100012001200ignore lead times for assembly and sub-assembly. Production capacity (per week) for component R is the bottleneck operation. Starting with zero inventory, the smallest capacity that will ensure a feasible production plan up to week 6 is |
| A. | 1000 |
| B. | 1200 |
| C. | 2200 |
| D. | 2400 |
| Answer» D. 2400 | |