Prestressed Concrete Structures
→
Transmission Length in Prestressed Concrete Structures
→
THE_PRESTRESSING_STEEL,_SHEATHING_AND_ANCHORAGES_S..
1.
THE_PRESTRESSING_STEEL,_SHEATHING_AND_ANCHORAGES_SHOULD_BE_STORED_AT:?$
A.
Site
B.
Road
C.
Room
D.
Bridge
Answer» B. Road
Show Answer
Discussion
No Comment Found
Post Comment
Related MCQs
The maximum eccentricity in the design of composite sections is given as ____________
The bottom fiber of the prestressed beams is expressed as ____________
The prestressing tendons are not grouted in the case of ____________
The prestressing steel, sheathing and anchorages should be stored at ____________
The coupling units are used in prestressing steel for ____________
In typical detail of expansion joint the open cell compression seal is dependant upon its ability to maintain ____________
Under minimum and maximum moments the critical stresses occur at ____________
The design considerations of composite section in step 3 and step 4 are ____________
The first two factors considered in design considerations of composite sections are ____________
The critical stress condition generally occurs at ____________
Reply to Comment
×
Name
*
Email
*
Comment
*
Submit Reply