| 1. |
The perimeter of a circular channel section is 18.84m, calculate the discharge through the channel when it is running full having a bed slope of 1 in 1500 and C = 60. |
| A. | 53.62 m3/s |
| B. | 63.62 m3/s |
| C. | 73.62 m3/s |
| D. | 83.62 m3/s |
| Answer» B. 63.62 m3/s | |