MCQOPTIONS
Saved Bookmarks
| 1. |
The operations file is updated by the |
| A. | production control system |
| B. | MRP system |
| C. | shipping system |
| D. | All of the above |
| E. | None of the above |
| Answer» E. None of the above | |