

MCQOPTIONS
Saved Bookmarks
1. |
The measure adopted to reclaim the water-logged area is |
A. | installation of lift irrigation schemes |
B. | lining of canals |
C. | lowering the full supply level |
D. | all of these |
Answer» B. lining of canals | |