MCQOPTIONS
Bookmark
Saved Bookmarks
→
Prestressed Concrete Structures
→
Transmission Length in Prestressed Concrete Structures
→
The Freyssinet system of post tensioning anchorage..
1.
The Freyssinet system of post tensioning anchorages was developed in:
A.
1934
B.
1935
C.
1939
D.
1936
Answer» D. 1936
Show Answer
Discussion
No Comment Found
Post Comment
Related MCQs
The method of tensioning Magnel-Balton system involves ___________
The drawback of Lee-McCall system is it cannot use ___________
In Lee-McCall system, the prestressing tendons are in the form of ___________
In Gifford-Udall system, the number of methods for prestressing members is?
Which of the following is a disadvantage of Freyssinet system?
The Freyssinet system of prestressing involves the arrangement of wires of number?
The Freyssinet system of post tensioning anchorages was developed in ___________
After the tensioning operation, the space between the tendons and the ducts are ___________
In post tensioning, the concrete units are cast by ___________
IN_LEE-MCCALL_SYSTEM,_THE_PRESTRESSING_TENDONS_ARE_IN_THE_FORM_OF:?$
Reply to Comment
×
Name
*
Email
*
Comment
*
Submit Reply