The following operations are required for tunnelling in rocky terrain : 1. Removing the foul gases 2. Marking the tunnel profile 3. Setting up and drilling 4. Checking misfire 5. Mucking The correct sequence is : |
A. | 1 2 3 4 5 |
B. | 2 3 5 4 1 |
C. | 4 2 1 3 5 |
D. | 2 3 1 4 5 |
Answer» E. | |