MCQOPTIONS
Saved Bookmarks
| 1. |
The expected out turn for earth work in excavation in ordinary soil per mazdoor per day is |
| A. | 1.00 cum |
| B. | 2.00 cum |
| C. | 3.00 cum |
| D. | 4.00 cum |
| Answer» D. 4.00 cum | |