MCQOPTIONS
Saved Bookmarks
| 1. |
The engineering change control system makes changes in the |
| A. | operations file |
| B. | production schedule |
| C. | work force data |
| D. | All of the above |
| E. | None of the above |
| Answer» B. production schedule | |