1.
The detention period of a rectangular tank is given by _______
A.
t0 = LBH/Q
B.
t0 = LB/HQ
C.
t0 = Q/LBH
D.
t0 = HQ/LB
Answer» B. t0 = LB/HQ
Show Answer
Discussion
No Comment Found
Post Comment
Related MCQs
The sedimentation basin should be made as deep as possible.
Detention time for a circular tank is given by _______
The design value of surface loading for horizontal flow circular sedimentation is _______
The detention period of the vertical flow clarifier is _______
What will be the surface area of the basin for a flow of 2*106 litre per day having a surface loading rate 10,000 litre/day/m2?
1cm per second settling velocity corresponds to a surface loading of ______ litre per day per m2.
The quantity of water flowing per hour per unit horizontal area is called ________
Range of Displacement efficiency in the plain sedimentation tank is ___________
The detention period of a rectangular tank is given by _______
Reply to Comment
×
Name
*
Email
*
Comment
*
Submit Reply
Your experience on this site will be improved by allowing cookies. Read
Cookie Policy
Reject
Allow cookies