MCQOPTIONS
Bookmark
Saved Bookmarks
→
Geotechnical Engineering
→
Swedish Slip Circle Method in Geotechnical Engineering
→
The cutting edge should be provided with an angle..
1.
The cutting edge should be provided with an angle of __________
A.
45°
B.
60°
C.
90°
D.
30°
Answer» E.
Show Answer
Discussion
No Comment Found
Post Comment
Related MCQs
The bottom plug is designed in _________ shape.
The skin friction developed in San Francisco Oakland Bay Bridge, was reduced by, which of the following methods?
Frictional resistance developed during the sinking the well depends on __________
For loose sand, the value of skin friction is between ________
At a given depth, the skin friction of the well is equal to __________
A sharp vertical edge for the well is provided at _________
The cutting edge should be provided with an angle of __________
An effective well curb should withstand ___________
THE_SKIN_FRICTION_DEVELOPED_IN_SAN_FRANCISCO_OAKLAND_BAY_BRIDGE,_WAS_REDUCED_BY,_WHICH_OF_THE_FOLLOWING_METHODS??$
The bottom plug is designed in_________ shape.$
Reply to Comment
×
Name
*
Email
*
Comment
*
Submit Reply