1. |
The cube strength of concrete required for both pre tensioning and post tensioning according to Indian standard codes are ___________ |
A. | 30 and 20 |
B. | 15 and 25 |
C. | 40 and 30 |
D. | 45 and 35 |
Answer» E. | |