MCQOPTIONS
Saved Bookmarks
| 1. |
The counter berm for a canal is provided so as to contain the saturation gradient line _____________ the bank? |
| A. | Out of |
| B. | Within |
| C. | Above |
| D. | Below |
| Answer» C. Above | |