MCQOPTIONS
Saved Bookmarks
| 1. |
The concrete work for the following part of the building of specified thickness is measured in square metres |
| A. | Root slabs |
| B. | Floors |
| C. | D.P.C. |
| D. | All the above. |
| Answer» E. | |