MCQOPTIONS
Saved Bookmarks
| 1. |
The aim of the value engineering is to |
| A. | minimize the overall cost of production without affecting the quality of product |
| B. | determine the value of overall production |
| C. | relate values of a job |
| D. | All of the above |
| Answer» B. determine the value of overall production | |