MCQOPTIONS
Saved Bookmarks
| 1. |
The additional lines which are measured to show the correctness of the chain surveying are called: |
| A. | check clines |
| B. | proof lines |
| C. | tie lines |
| D. | all of these. |
| Answer» E. | |