| 1. |
tasks being performed in different stages : |
| A. | . require different amount of time |
| B. | . require about the same amount of time |
| C. | . require different amount of time with time difference between any two tasks being same |
| D. | . require different amount with time difference between any two tasks being different |
| Answer» B. . require about the same amount of time | |