

MCQOPTIONS
Saved Bookmarks
1. |
State-owned power giant NTPC has set a target to install ________________of renewable energy (RE) capacity by 2032. |
A. | 60 GW |
B. | 65 GW |
C. | 70 GW |
D. | 75 GW |
E. | None of these |
Answer» B. 65 GW | |